Tag: btech reports

Railway Monitoring with automatic fatak control

parts required Microcontroller LCD 16x 2 Motor in this project we will monitor train position using Reed switch sensor. Two sensor will be for automatic railway crossing. We will use 16×2 LCD to display train position . We can use GPS and GSM for train position . IOT can be used to show current position.

Back To Top
Open chat